101 Avenue ya Hampton, Haja ham Massachusetts, USA

UZOEFU NA UWEZEKANO WA TEKNOLOJIA YA ST TATA JUU YA KURUKA ASH MANUFAA KATIKA MTAZAMO WA MRADI KUTEKELEZWA KATIKA JANIKOSODA POWER KUPANDA KATIKA POLAND

ABSTRACT

Vifaa vya ST & Teknolojia LLC (STET) imekuwa kazi ya biashara ya kuruka Ash manufaa ya mifumo tangu 1995. STET ya electrotuli manufaa teknolojia inapunguza maudhui ya carbon ya makaa ya mawe kuruka Ash, kuzalisha thabiti, chini Carbon Ash kwa ajili ya matumizi kama mbadala kwa ajili ya saruji. Kuruka Ash na viwango vya kaboni > 25% kuwa kutumika kwa proPunguza Ash pamoja na kiwango cha Carbon kudhibitiwa ya 2 ± 0.5%. Bidhaa tajiri kaboni ni wakati huo huo zinazozalishwa na kuokoa thamani ya mafuta ya carbon.

STET mpya mradi katika Poland ambayo ni pamoja na mvua- to-dry ash collection conversion and an STET carbon separator was successfully commissioned in May 2010.

1.QUALITY LIMITING AVAILABLE CONCRETE GRADE FLY ASH

Of the approximately 70 million tons of fly ash generated each year at US coal-fired power plants, tu kuhusu 14 million tons is used as a cement substitute in concrete production. Much of this rejected fly ash fails to meet chemical and physical specifications for use in concrete. A similar situation occurs in Europe. While some of this off-quality ash is utilized as structural fill material or for other low-value uses, much of it is simply disposed of in landfills or waste ponds.

An excessive amount of unburned carbon in fly ash is the most common problem. The American Association of State Highway and Transportation Officials (AASHTO) and European Standards (KISTARI 450 Category A) require that the amount of unburned carbon in fly ash, measured by loss on ignition (WA) not exceed 5% by weight. Hata hivyo, starting in the mid-1990’s, installation of mandated NOx control equipment at coal-fired power plants increased the carbon (WA) content of much of the previously marketable fly ash. Further requirements to reduce NOx and other power plant emissions have resulted in the contamination of fly ash with ammonia. As a consequence, while understanding of the benefits of using fly ash in concrete continues to increase, the availability of suitable quality fly ash is decreasing. Processes to economically beneficiate off-quality fly ash are thus also of increasing interest to the power and concrete industries. Separation Technologies has pioneered such processes for both carbon and ammonia removal from fly ash.

2.ST EQUIPMENT & TECHNOLOGY LLC TECHNOLOGY OVERVIEW

2.1. Fly Ash Carbon Separation

In the STET carbon separator (Kielelezo 1), material is fed into the thin gap between two parallel planar electrodes. Chembe ni za kiumeme zinazoshtakiwa na mawasiliano ya mchanganyiko. The positively charged carbon and the negatively charged mineral are attracted to opposite electrodes. The particles are then swept up by a continuous moving belt and conveyed in opposite directions. Ukanda husonga chembe karibu na kila uchaguzi wakipanda kuelekea mwisho wa mgawanyiko. Kasi ya ukanda wa juu pia inawezesha njia za juu sana, hadi 40 tani kwa saa kwenye kitenganishi kimoja. Mwanya mdogo, high voltage field, kabiliana na mtiririko wa sasa, vigorous particle-particle agitation and self-cleaning action of the belt on the electrodes are the critical features of the STET separator. Kwa kudhibiti vigezo mbalimbali vya mchakato, kama vile kasi ya ukanda, kulisha pointi, and feed rate, the STET process produces low LOI fly ash at carbon contents of less than 3.5% from feed fly ashes ranging in LOI from 5% zaidi kwa 25%.

Mtini. 1. ST Separator

The separator design is relatively simple and compact. Mashine iliyoundwa kwa mchakato 40 tani kwa saa ni takriban 9 m (30 futi.) muda mrefu, 1.5 m (5 futi.) pana, na 2.75 m (9 futi.) juu. Ukanda na rollers kuhusishwa ni sehemu tu ya kusonga. The electrodes are stationary and composed of an appropriately durable plastic material. The belt is made of plastic. The separator’s power consumption is below 1 kilowati kwa tani moja ya vifaa vya kusindika na wengi wa nguvu zinazotumiwa na motors mbili kuendesha ukanda wa.

ST Equipment & Technology

Mchakato ni kavu kabisa, requires no additional materials other than the fly ash and produces no waste water or air emissions. The recovered materials consist of fly ash reduced in carbon content to levels suitable for use as a pozzolanic admixture in concrete, and a high carbon fraction useful as fuel. Matumizi ya mito yote miwili ya bidhaa hutoa 100% ufumbuzi wa matatizo ya utupaji wa majivu.

2.2. Recovered fuel value of high-carbon fly ash

In addition to the low carbon product, brand named ProAsh® , for use in concrete, the STET separation process also recovers otherwise wasted unburned carbon in the form of carbon-rich fly ash, branded EcoTherm. EcoThermhas significant fuel value and can easily be returned to the electric power plant using the STET EcoThermReturn system to reduce the coal used at the plant. When EcoThermis burned in the utility boiler, the energy from combustion is converted to high pressure / high temperature steam and then to electricity at the same efficiency as coal, typically 35%. The conversion of the recovered thermal energy to electricity in STETs’ EcoThermReturn system is two to three times higher than that of the competitive technology where the energy is recovered as low-grade heat in the form of hot water which is circulated to the boiler feed water system. EcoThermis also used as a source of alumina in cement kilns, displacing the more expensive bauxite which is usually transported long distances. Utilizing the high carbon EcoThermash either at a power plant or a cement kiln, maximizes the energy recovery from the delivered coal, reducing the need to mine and transport additional fuel to the facilities.

Mtini. 2. EcoThermReturn system

STET’s Constellation Power Source Generation Brandon Shores, SMEPA R.D. Kesho, NBP Belledune, RWEnpower Didcot, EDF Energy West Burton, and RWEnpower Aberthaw plants, all include EcoThermReturn systems (Kielelezo 2). The newest installation of an STET carbon separator in Poland will also include an EcoThermReturn system. The essential components of the system are presented in Figure 2. EcoThermis conveyed dry to a filter receiver over the coal belts. To prevent dusting about 7-10 wt% water is added to the

EcoThermin a high speed pin mixer before dropping onto the coal on the belt as the coal is conveyed to mills.

2.3. ST Ammonia Removal Process

Power plants are increasing utilization of ammonia injection to mitigate NOx and SO3 emissions. NOx in the flue gas is reduced by reaction with ammonia under certain conditions through Selective Catalytic (SCR) or Selective Non-Catalytic (SNCR) systems. While ammonia is consumed in these processes, some excess ammonia is required for proper control of the NOx. Any residual ammonia deposits on fly ash in typical cold-side electrostatic precipitator ash collection systems. To reduce particulate or SO3 aerosol emissions, ammonia is injected into the flue gas just prior to the precipitators resulting in ammonium sulfates depositing on the fly ash. While ammoniated ash is not detrimental to concrete performance, when the ammoniated ash is mixed with the alkaline cement in production of concrete, the ammonia is volatilized potentially endangering workers.

To remove ammonia as a gas from the fly ash, the ST process utilizes the same fundamental chemical reaction that results in ammonia release in concrete. Liberation of ammonia from fly ash requires that the ammonium ionmolecular ammonia equilibrium be shifted in favor of ammonia by the presence of alkali. Fly ashes with naturally high alkalinity need no additional alkali. For less alkaline ashes, any strong alkali will serve. The cheapest source of alkali is lime (CaO). The reaction of ammonium salts with lime liberating ammonia is strongly favored by chemical equilibrium. The chemical reaction occurs rapidly once the compounds are dissolved.

Mtini. 3: STET Ammonia Removal System

A schematic diagram of the ST ammonia removal process is shown in Figure 3. Ash, water and lime in controlled proportions are metered to a mixer. To assure rapid mixing and uniform dispersion of the added water and alkali, a high intensity mixer is used. A low intensity device such as a pug mill is used as a secondary mixer to provide good air contact to permit transport of ammonia from the bulk of the ash. Since the moisture content of the ash is very low, the material flows through this mixer as a highly agitated dry powder. Ammonia gas collected in both the high and

ST Equipment & Technology

low speed mixers is recycled to the generating unit flue.

The deammoniated ash is dried by conveying the material through a flash drier to remove excess water. Final ash temperatures of approximately 65ºC (150oF) are adequate to produce a completely free- flowing dry product.

The process recovers 100% of the fly ash treated and the resulting ash meets all specifications for use in concrete. STET’s ammonia removal process can be used alone or in combination with the company’s carbon separation technology. This modular approach offers the lowest cost solution for treating otherwise unusable fly ash.

This commercial scale operation can handle up to

47 tonnes per hour of contaminated ash, reducing the ammonia content to less than 75 mg/kg. Full-scale STET ammonia removal systems are now operating at Jacksonville Electric Authority SJRPP, TEC Big Bend, and RWE npower Aberthaw ash processing facilities.

3. STET ASH PROCESSING FACILITIES

Controlled low LOI fly ash is produced with STET’s technology at eleven power stations throughout the U.S., Kanada, the U.K., Poland and Korea. The processed fly ash is marketed under the ProAsh® brand throughout these market areas. ProAsh® fly ash has been approved for use by over twenty state highway authorities, as well as many other specification agencies. ProAsh® has also been certified under Canadian Standards Association and EN 450:2005 viwango vya ubora katika Ulaya. STET ash processing facilities are listed in Table 1.

Katika 2008, STET commissioned its largest US fly ash beneficiation facility at the Tampa Electric Company Big Bend Station in Florida. Two STET separators are installed to produce low LOI ProAsh® . A first-of-its-kind third separator is used to further concentrate the carbon to maximize the fuel value of the EcoThermand to maximize the amount of ProAsh® recovered. The Big Bend facility, which produces 260,000 tons per year of ProAsh®, includes a 25,000 ton dome for feed ash, na 10,000 ton silo for ProAsh® and a 6,500 ton silo for EcoTherm.

3.1. ZGP Project, Polandi

In April 2010 the first STET Separator installation in continental Europe was commissioned on the boundary of the combined steam and power plant of Soda Polska Ciech Sp z o.o. – Janikosoda and Inowrocław plants in Poland. This ash processing facility, developed jointly with STET, is owned and operated by ZGP Sp. z o.o., a joint venture company of Lafarge Polska SA and Soda Polska CIECH Sp. z

o.o.The power plants produce about 180,000 tonnes per year fly ash which was transported wet to lagoons 2 km away.

The facility was built at the boundary of the power plant. The project included the conversion of the wet ash collection and transport systems for five

boilers to a dry ash dense phase collection systems, an STET Separator, storage silos for the feed ash, the ProAsh® and the EcoThermproducts, and an EcoThermReturn System to return the EcoThermto the boilers to recover the fuel value, as well as auxiliary buildings, compressors and new roads. Because feed ash is also be processed from the nearby Inowrocław- Matwy power plant owned by Soda Polska Ciech Sp. z o.o., provisions have been made for unloading feed ash hauled to the facility in pneumatic tanker trucks. The process flow diagram for the ash beneficiation facility is shown in Figure 4 and the general facility layout in Figure 5. The low LOI ProAsh® is produced to EN450:2005 standards and is used at the nearby cement plant owned by Lafarge to produce fly ash cement. A 30,000 tonnes dry ash silo was built within the premises of the cement plant, to store ash during the winter season.

Mtini. 4. ZGP Process Diagram

Mtini. 5. ZGP Site Plan

TRUCK SCALE

Feed unloading

EcoTherm silo

Pipe rack from power plant

ProAsh® silo

Feed ash silo

ST separator building

ST Equipment & Technology

Mtini. 6. ZGP ST fly ash beneficiation plant

3.2 Design Basis

Ash volume to be processed annually: 180,000 T

WA

8%

Operation time

8000 hours/year

ProAsh®

WA 4%

EcoTherm

WA 30% min.

EcoThermcombusted by the power plant 24,000 tonnes/year, the remaining volume to be used by the

cement plant

Staff

15 employees

Scope of the project:

1.Disassembly of the wet transport system

2.Delivery and assembly of the new dense phase conveying system

3.Delivery and assembly of compressors

4.Construction of the ash separation facility Silos: Feed Ash silo 1,200T

ProAsh® 1,000T EcoTherm ™1,000T

5.Construction of roads and site infrastructure Facility start-up in May 2010

The project was implemented within the planned budget and on schedule.

3.3Performance of the facility in 2011

Based on the positive operational experience acquired during the start-up operations, and on 2010 performance, the facility management decided to process additional ash from other power plants, with a higher carbon content in fly ash than acceptable according to the EN 450 standard.

The LOI in the delivered ash was from 8 kwa 20%. In the light of the above, the ash volume processed by the ZGP facility increased in 2011 kwa 220,000 tonnes.

Brief summary of 2011 data:

Processed ash volume:

220,000 tonnes

Including ash from other power plants

30,000 tonnes

Average fly ash LOI

ca.

10%

Facility operation time

8200 hours

Average product LOI:

LOI ProAsh®

4%

LOI EcoTherm

ca.

40%

LOI for fly ash, ProAsh® and EcoThermkatika 2011

4. SUMMARY

The completed fly ash processing facility, based on the technology delivered by Separation Technologies LLC completely eliminated the need to store fly ash at Mątwy and Janikowo power plants.

The waste fly ash that had caused environmental damage for years and had been stored outside the premises at a very high cost became a marketable product called ProAsh® and is now wholly utilized by the cement industry, conforming to the EN-450 standard.

EcoThermis now used as fuel by the power plant and cement plant, reducing the amount of coal burnt by those plants and thus increasing the efficiency of boilers.

The project met both its financial and environmental objectives. The facility demonstrated a high ash processing capability, in terms of quality, quantity and processing technology, and proved reliable.

Maximizing the utilization of fly ash as a cement substitute in concrete production substantially reduces the carbon dioxide emissions associated with construction activity. In order to avoid loss of this valuable resource of material for concrete production as well as reduction of green house gas emissions associated with concrete construction, processes for restoring the quality of the fly ash in an economic and environmentally viable way are needed.

The beneficiation of fly ash with Separation Technologies’ processes further increases the supply of this important material. The ST beneficiation processes continue to be the most extensively applied methods to upgrade otherwise unusable fly ash to high value materials for cement replacement in concrete. 19 STET carbon separators are in place with over 100 machine-years of operation.

ProAsh® has found wide acceptance in the concrete industry as a premium fly ash requiring far less monitoring of air entrainment requirements due to less LOI variability than other ashes.

Returning the high-carbon concentrate from the STET process to the boiler at a power plant allows recovery of the recovered carbon fuel value at efficiency similar to coal.

STET offers a complex of economically efficient technologies for receiving ash of the improved quality that would otherwise be landfilled. Technologies of electrostatic carbon separation, Ecothermreturn to the boiler, and ammonia removal provide a modular solution of problems relating to fly ash utilization and environmental protection in power sector. These three technologies can be implemented in phases, or

Jedwali. STET Commercial Operations

as a single project. In Table brief data on results of implementation and commercial operation of STET coal ash beneficiation installations are presented.

Matumizi / Power Station

Mahali

Start of Commercial operations

Facility Details

Progress Energy – Roxboro Station

North Carolina, USA

Septemba 1997

2 Vitenganishi

Constellation Power Source GenerationBrandon Shores Station,

Maryland, USA

Aprili 1999

2 Vitenganishi 35,000 ton storage dome. EcoTherm Return 2008

ScotAsh (Lafarge / Scottish Power Joint Venture) – Longannet Station

Scotland ,UINGEREZA

Oktoba 2002

1 Kitenganishi

Jacksonville Electric AuthoritySt. John’s River Power Park, FL

Florida, USA

Mei 2003

2 Separators Coal/Pet coke blends Ammonia Removal

South Mississippi Electric Power Authority R.D. Morrow Station

Mississippi, USA

Januari 2005

1 Separator EcoTherm Return

New Brunswick Power Company Belledune Station

New Brunswick, Kanada

Aprili 2005

1 Separator Coal/ Pet coke Blends EcoTherm Return

RWE npower Didcot Station

Uingereza, UINGEREZA

Agosti 2005

1 Separator EcoTherm Return

PPL Brunner Island Station

Pennsylvania, USA

Desemba 2006

2 Vitenganishi 40,000 Ton storage dome

Tampa Electric Co. Big Bend Station

Florida, USA

Aprili 2008

3 Vitenganishi, kupita mara mbili 25,000 Ton storage dome Ammonia Removal

RWE npower Aberthaw Station (Lafarge Cement UK)

Wales, UINGEREZA

Septemba 2008

1 Separator Ammonia Removal EcoTherm Return

EDF Energy West Burton Station (Lafarge Cement UK, Cemex)

Uingereza, UINGEREZA

Oktoba 2008

1 Separator EcoTherm Return

ZGP (Saruji ya Lafarge Poland / Ciech)

Polandi

Mei 2010

1 Kitenganishi

The Customer wishes to remain anonymous

Ulaya

2011

1 Kitenganishi

The Customer wishes to remain anonymous

Kanada

2011

1 Kitenganishi

KEPCO

Korea Kusini

2014

1 Separator EcoTherm Return

JV (Termika / Saruji ya Lafarge Poland)

Polandi

2016

1 Separator EcoTherm Return